Coordinating MEP From Design to Commissioning
MEP works are frequently the most coordination-heavy part of a project, involving multiple specialist contractors whose installations must fit within tight ceiling voids and riser spaces without clashing. We review MEP design against architectural and structural drawings before installation, sequence trades against the main programme, and manage the interface between MEP contractors and the main contractor on site.
At completion, we oversee testing and commissioning against design intent, including system handover documentation, so the building’s mechanical, electrical, and plumbing systems perform as designed from day one of occupancy.